Tracker · Pre-application
Duke Energy - Belews Creek, NC
The U.S. Nuclear Regulatory Commission (NRC) engaged in pre-application activities with Duke Energy regarding a future ESP that would be at the Belews Creek, N.C., site for small modular reactors or non-light-water reactors.
- Who
- Duke Energy
- Design
- Not stated
- Reactor type
- Other Designs/ Not Specified
- Status
- Active on the NRC index
- What
- Preapplication activities associated with a future ESP under 10 CFR Part 52
- When
- Currently in preapplication period with plan for ESP submittal December 2025
- Site
- Not stated on the NRC page in this snapshot.
- NRC page reviewed
- Tuesday, September 15, 2026
Dockets
Status timeline
Dates are printed as the NRC page prints them, including the actual (A) or target (T) mark.
The NRC page in this snapshot does not list a milestone table.
NRC activity table
The NRC page in this snapshot does not list a product activity table.
Related Federal Register notices
Included when a notice shares a docket printed on the NRC page, or when the notice title repeats the project or design name. Other NRC notices are left out.
No in-scope Federal Register notice is linked to this project.